TW-2 Role: Design / Delivery Architects / Lead Consultants
Client: The Hall
Completion: Summer 2010
Location: Chipping Norton
The building was originally a Quaker Hall which had become dilapidated. The building was bought by our clients who are a Media Production Company. A mezzanine deck was introduced into the existing hall to contain Recording Studios, Post Production Rooms, a Film Studio & meeting room. The existing stonewalls were carefully repaired, windows & doors replaced while being sympathetic with the needs of a Conservation Zone
TW-2 led project from RIBA Stage 4 to completion.